Building Control Fees Explained: How Much Does Building Control Cost?

Building Control Fees Explained – Homeowners reviewing building plans, construction costs and building control fees for a UK house extension project.

Quick summary: Building Control Fees Explained

Building Control Fees Explained is a straightforward guide to what homeowners in England pay for Building Regulations approval, plan checking and site inspections. For many typical domestic extensions, published council charges fall somewhere around £500–£1,300 including VAT, although larger or more complex projects can cost more.

  • Small domestic alterations: often a few hundred pounds, depending on the work and local authority.
  • Single-storey extensions: published 2026 council examples range from around £530 to over £1,000, depending on size and location.
  • Loft conversions: commonly several hundred pounds to over £1,000 in published council fee schedules.
  • Private building control: fees are individually quoted by registered building control approvers.
  • VAT: standard Building Control services in England are generally subject to VAT at 20%. Certain statutory charges, including local authority regularisation fees, are treated differently.
  • Payment: some providers charge upfront, while others split fees between the application and inspection stages.

There is no single national Building Control fee. The amount depends on your project, your chosen building control body and its current charging schedule. Importantly, Building Control charges are normally separate from planning permission fees, technical drawings and structural calculations.

Below, we explain what the charges cover, how to compare quotes, when exemptions may apply and how to avoid unexpected costs before building work begins.

Not sure what Building Control will cost for your project?

Plans Made Easy can help you understand which approvals, drawings and supporting documents your proposed work may need.

Ask About My Project

What Are Building Control Fees and Why Do You Pay Them?

If you're planning a home extension, loft conversion, garage conversion or structural alteration, you may already have allowed money for builders, materials and drawings. However, another cost often appears in the paperwork: Building Control fees.

These charges pay for the professional building control service that assesses whether relevant building work complies with the Building Regulations. Depending on the application route, this can involve checking technical plans, inspecting work during construction and considering whether the completed project meets the relevant requirements.

Building Control is concerned with matters such as structural safety, fire protection, ventilation, drainage and energy efficiency. Our guide to how the inspection and approval process works explains its role in more detail.

Building Control fees vs planning permission fees

Homeowners sometimes confuse these two payments. Although both may be required for the same extension, they serve different purposes.

  • Planning permission fees relate to whether the proposed development is acceptable under planning rules.
  • Building Control charges relate to checking compliance with the Building Regulations.
  • Professional drawing fees pay for preparing the technical information needed for applications and construction.

Even if your extension qualifies as permitted development and does not require a full planning application, Building Regulations approval may still be necessary.

Important: Planning permission and Building Regulations approval are separate processes. Having one does not automatically mean you have the other.

Average Building Control Fees in England: How Much Should You Budget?

So, how much does Building Control cost for an ordinary homeowner? There is no national fixed price. Councils publish their own charging schemes, while private registered building control approvers agree fees directly with clients.

As an initial budgeting allowance, many straightforward domestic projects may fall within a range of several hundred pounds to approximately £1,300. However, this is only a guide, not a national tariff. Large extensions, unusual structures and combined projects may attract higher, individually calculated charges.

Real examples from published 2026 council fee schedules

The following examples show why checking your own local authority matters. These are published charges for particular categories of work, rather than average prices across England.

ProjectCouncil examplePublished charge
Extension up to 10m²North Somerset£530
Extension over 10m² up to 40m²North Somerset£775
Extension over 40m² up to 60m²North Somerset£875
Single-storey extension under 100m²Ashford (Full Plans)£1,066
Two-storey extension under 100m²Ashford (Full Plans)£1,267
Loft conversion up to 40m²North Somerset£860
Garage conversionNorth Somerset£575

Figures include VAT and come from North Somerset's April 2026 schedule and Ashford's April 2026 standard Full Plans charges. Categories and charging structures differ. Always obtain a current quotation before relying on these amounts.

For the wider financial picture, our complete guide to budgeting for a house extension explains how professional fees, approvals and construction expenses fit together.

Quick costs snapshot: what affects your Building Control charge?

  • Project size: a larger extension can require more checking and inspections.
  • Complexity: structural alterations and unusual designs may need additional assessment.
  • Application route: Full Plans and Building Notice charges may differ.
  • Location: different councils publish different schedules.
  • Inspection requirements: additional visits or specialist checks may affect the final amount.

Building Control Fees for an Extension: What Changes the Cost?

A modest single-storey rear extension is usually more straightforward to assess than a large wrap-around extension with extensive structural alterations. Consequently, the fee may be lower.

When assessing charges, building control bodies may consider the floor area, type of construction, scope of structural work and expected inspection requirements.

Single-storey extension fees

Typical checks include foundations, drainage, structural elements, insulation, ventilation and other relevant construction details. If the work is conventional, a council may offer a standard fixed charge.

Double-storey extension fees

A two-storey project may involve more complicated structural arrangements, roof construction and fire safety considerations. Therefore, charges can be higher than for a comparable single-storey scheme.

Combined projects and additional work

If you're extending the kitchen while also converting the loft or removing several load-bearing walls, ask whether all work is included in one quotation. Some councils use bespoke charges for combined projects.

Our single-storey project cost breakdown can help you assess these expenses alongside your overall construction budget.

Tip: Send the building control body a clear description of every proposed alteration. A complete scope makes it easier to receive a realistic quotation and reduces the risk of discovering omitted work later.

What Do Building Control Fees Actually Include?

Before accepting a quotation, understand what you're buying. A standard charge usually relates to the building control body's assessment and inspection service, but the precise scope depends on the provider and application route.

Plan checking

Under the Full Plans route, technical information is assessed against the relevant Building Regulations. This may involve construction details, structural information, insulation specifications and drainage arrangements.

You may need separately prepared technical drawings for Building Regulations approval to support the application.

Site inspections

Building Control normally needs to inspect work at relevant stages, which may include foundations, drainage, structural construction and completion.

The precise inspection stages depend on the project and the building control body's requirements. For more detail, see our homeowner guide to construction-stage inspections.

Completion assessment

Once the relevant work is finished, Building Control considers whether it can issue a completion certificate or, where applicable, a final certificate. Outstanding defects or missing information can delay this.

Building Control fees do not normally pay for your designer, structural engineer, builder or any remedial work that may be necessary.

Council vs Private Building Control Fees: Which Is Better Value?

In England, homeowners undertaking ordinary domestic projects can often choose between local authority Building Control and a private Registered Building Control Approver (RBCA).

Both operate within the regulatory framework, but their charges, administrative arrangements and services may differ.

Local authority Building Control

  • Publishes a charging scheme and standard categories where applicable.
  • May offer individually determined fees for more complicated projects.
  • Can deal with local authority regularisation applications for eligible historic work.

Private registered building control approvers

  • Usually provide an individual quotation.
  • May offer different communication and inspection arrangements.
  • Must be appropriately registered for the work they undertake.
  • Cannot issue local authority regularisation approval.

Neither option is automatically cheaper. Compare the complete price, expected inspections, treatment of design changes and any additional charges.

Note: An Approved Inspector is commonly referred to as a private Building Control provider. In England, the current regulatory terminology is Registered Building Control Approver.

Need help preparing for Building Regulations approval?

Our team can help you identify the drawings and technical information your extension may require before you approach Building Control.

Check My Requirements

Are Building Control Fees Subject to VAT?

Yes, standard local authority Building Control plan-checking and inspection services in England are generally subject to VAT at the standard rate of 20%. Private building control providers also normally charge VAT on their taxable services.

This can make a noticeable difference when comparing prices. For example, a quoted fee of £800 excluding VAT becomes £960 including VAT.

However, not every building-related council payment has the same VAT treatment. Local authority regularisation charges are generally treated as outside the scope of VAT, as illustrated by published council schedules.

Do Building Control fees include VAT?

Some council tables display the full price including VAT, while others show a net charge, VAT and a total. Always check the column headings carefully.

Gotcha: Don't compare a £750 fee excluding VAT with a £900 fee including VAT and assume the first provider is cheaper. Both total £900 once VAT is included.

Building Control Fee Exemptions: When Might You Pay Less?

Certain work may qualify for a fee exemption. In particular, work carried out solely to provide appropriate facilities or access for a disabled person may qualify, subject to the applicable legal conditions.

However, exemption from a charge does not automatically mean exemption from the Building Regulations themselves.

What about small outbuildings and garden rooms?

Some detached outbuildings can be exempt from particular Building Regulations requirements where the prescribed conditions are met. Factors include floor area, use, construction and proximity to boundaries.

Nevertheless, separate rules may still apply to electrical installations and other work. A garden building is not automatically exempt simply because it is small.

Before assuming an exemption, check with your building control body and review our guide to compliance requirements for outbuildings.

When Do You Pay Building Control Fees?

The payment arrangement depends on the building control body and application route. Consequently, two homeowners undertaking similar projects may receive different payment schedules.

Full Plans applications

Some local authorities split their Full Plans charges into a plan-checking fee and an inspection fee. The initial payment may be due when the application is submitted, with the inspection element payable later.

Other councils collect the combined charge upfront. Therefore, ask for the exact payment schedule before submitting your application.

Building Notice applications

Where this route is permitted, a Building Notice commonly involves a single upfront charge. It does not provide the same formal advance plans approval as the Full Plans route.

Retrospective regularisation

If qualifying building work was undertaken without the required approval, the local authority may accept a regularisation application. This involves a separate fee and may require opening up completed construction to establish compliance.

Regularisation is not guaranteed. Furthermore, the retrospective route applies only to eligible work and does not remove the need to correct non-compliant construction.

Building Control Fees and Charges Regulations in England

Local authority charging is governed by legislation rather than a single national price list. Historically, charges were principally regulated by the Building (Local Authority Charges) Regulations 2010.

A new charging framework was introduced through the Building (Local Authority Charges and Amendments Relating to Charging) (England) Regulations 2026.

Most of the new regulations came into force on 6 November 2026, with certain provisions having later commencement dates. The reforms expand the range of chargeable building control functions and allow fuller recovery of relevant service costs through published charging schemes.

This does not establish one uniform fee across England. Councils must publish their applicable schemes, and homeowners should check which charges are in force when applying.

Why is Building Control sometimes so expensive?

The charge reflects more than a brief site visit. It can contribute towards professional technical assessment, inspections, administration and the wider cost of providing the regulatory service.

More complicated work may need additional scrutiny. However, a high fee is not necessarily better value, which is why comparing the service scope remains important.

How to Budget for Building Control Fees Without Unpleasant Surprises

We recommend treating Building Control as a separate item within your project's professional fees and approvals budget, rather than leaving it until construction is about to begin.

Step-by-step Building Control cost checklist

  1. Define your project. Include extensions, structural alterations, conversions and associated work.
  2. Check whether Building Regulations approval is required. Don't assume permitted development means no Building Control.
  3. Prepare suitable drawings. Clear technical information helps explain the proposed construction.
  4. Check the local council's current charging scheme. Identify whether a standard or bespoke quote applies.
  5. Consider an RBCA quotation. Compare the overall service, where this option is available.
  6. Confirm VAT and payment stages. Establish the total amount payable and when invoices fall due.
  7. Ask about additional charges. Check the position on amended plans, additional inspections and prolonged projects.
  8. Keep your records. Retain invoices, inspection correspondence and completion documentation.

Common Building Control budgeting mistakes

  • Assuming the planning application payment includes Building Control.
  • Forgetting to allow for VAT.
  • Comparing quotations that cover different services.
  • Leaving out structural alterations when describing the work.
  • Failing to budget for necessary technical drawings or engineer calculations.
  • Starting relevant work without making the required application or notification.
Important: Building without the required approval can create significant problems. The authority may require evidence of compliance, opening-up works or remedial construction. Enforcement action may also be possible. Sorting matters out afterwards can be more expensive than following the correct process from the start.

Building Control Costs Compared: What Else Should Be in Your Budget?

Building Control is only one element of the wider approval and construction process. Depending on your proposal, you may also need to pay for design work, structural engineering, specialist assessments and other consents.

For example, an extension involving a large opening through an existing external wall may require structural calculations for steelwork. Those engineering fees are separate from Building Control's assessment of the submitted information.

Likewise, approved construction details may need to address insulation performance under Part L or fire safety under Part B. The cost of preparing this information is not necessarily included in the building control body's charge.

A clear breakdown of these items helps you avoid comparing a basic construction quotation with a more complete project budget.

Conclusion: Understand the Full Building Control Charge Before You Start

Building Control Fees Explained comes down to one important principle: understand what is included before committing to a price.

For many straightforward residential projects in England, the charge will be several hundred pounds, although larger or more complicated work can exceed £1,000. The precise figure depends on the current local charging scheme, the work itself and the building control service chosen.

By obtaining an itemised quotation, checking VAT, confirming the payment stages and arranging the correct technical information, you can plan more confidently and reduce the risk of unexpected costs.

FAQs: Building Control Fees Explained

How much are Building Control fees in the UK?

There is no single UK-wide charge. In England, straightforward domestic projects often cost several hundred pounds, while larger extensions may exceed £1,000. Local council schedules vary, and private registered building control approvers set their own quotations. Scotland, Wales and Northern Ireland have different regulatory arrangements.

How much does Building Control cost for an extension?

Published 2026 examples include £775 for a North Somerset extension over 10m² up to 40m² and £1,066 for an Ashford single-storey extension under 100m² using the Full Plans route. Both figures include VAT. Your own council may charge differently.

Are Building Control fees subject to VAT?

Standard local authority Building Control plan-checking and inspection charges in England are generally subject to VAT at 20%. Local authority regularisation charges have different treatment and are generally outside the scope of VAT. Always check the provider's invoice.

When do you pay Building Control fees?

Some councils collect the complete charge when you apply, while others separate the Full Plans assessment fee from later inspection charges. Building Notice fees are commonly collected upfront. Confirm the payment arrangement with your chosen provider.

Do you have to pay for Building Control?

Where Building Regulations approval is required, a charge will normally be payable unless a specific exemption applies. Certain disability-related work may qualify for an exemption. Some work may be exempt from Building Regulations requirements altogether, subject to the relevant conditions.

What happens if you build without Building Control?

If approval or notification was required but not obtained, you may encounter enforcement action, difficulties demonstrating compliance and problems when selling your property. For some eligible historic work, local authority regularisation may be available, but approval is not guaranteed.

What is the difference between private and council Building Control fees?

Local authorities operate published charging schemes, sometimes with standard categories and bespoke quotations. Private registered building control approvers negotiate their fees directly. Compare total cost, inspections, service arrangements and potential additional charges.

Are Building Control fees negotiable?

Private providers may offer different quotations depending on the scope of work. Councils must apply their published charging schemes but may determine individual charges for projects outside standard categories. Ask for clarification if the proposed scope or fee appears incorrect.

Are there exemptions from Building Control fees?

Some work undertaken solely for the benefit of a disabled person may qualify for a fee exemption. Separately, certain types of small detached building may be exempt from particular Building Regulations requirements. Eligibility depends on the exact circumstances and should be checked before work begins.

Why is Building Control so expensive?

Charges can cover technical assessment, administration, site inspections and associated service costs. Complex construction may need greater professional input. Local authority charges are based on applicable cost-recovery arrangements rather than a fixed nationwide tariff.

Are Building Control fees refundable?

Refunds depend on the applicable regulations, published charging scheme and circumstances. For example, certain failures to issue an application decision within the required period can trigger a refund obligation under the 2026 regulations. A change of mind or cancelled project does not automatically entitle you to a full refund.

What is cost control in construction, and is it the same as Building Control?

No. Construction cost control means managing a project's budget, materials, labour and financial risks. Building Control is the regulatory process for checking compliance with Building Regulations. Building Control fees are one expense within your overall construction budget.

Still have questions about approvals and fees?

Tell us what you're planning and we'll help you understand the technical information and approval stages that may apply.

Discuss My Project

Next Steps & Useful Plans Made Easy Guides

If you're planning an extension, conversion or alteration, the following guides will help you understand the wider approval process and costs.

Key Facts Snapshot – Building Control Fees Explained
  • Typical domestic charges Often several hundred pounds to £1,300+, depending on the project and provider.
  • National fixed fee? No. Local charging schemes and private quotations vary.
  • VAT Generally 20% on standard Building Control services in England, with different treatment for certain statutory charges.
  • Payment timing Upfront or in stages, depending on the provider and application route.
  • Planning permission included? No. Planning and Building Regulations are separate approval systems.
  • Possible exemptions Certain qualifying disability-related work and specific exempt building work.
  • 2026 charging changes New regulations introduced on 6 November 2026, with some later commencement provisions.
  • Best first step Confirm your project scope and request the current full charge, including VAT and inspection arrangements.

Official Guidance and Building Control Fee Sources

For the latest statutory requirements and local charging information, use these official resources:

Information checked: November 2026. This guide focuses on residential building work in England. Local charging schedules can change, and the rules differ elsewhere in the UK. The published prices are examples, not guaranteed quotations.

Ready to move your home improvement project forward?

Plans Made Easy can help with your drawings, Building Regulations documentation and the steps towards a compliant project. Contact our team to discuss what you need before work begins.

Get in Touch
PME Performance Verified Badge

Performance Verified ✅

This page meets PME Optimisation Standards — achieving 95+ Desktop and 85+ Mobile PageSpeed benchmarks. Verified on

Article review and update information:
Last updated: November 23, 2026

•

Published: November 23, 2026

✅ Reviewed by Stuart Cronshaw   

Stuart Cronshaw – Plans Made Easy

Written & Reviewed by Stuart Cronshaw

Stuart is the founder of Plans Made Easy and an experienced architectural consultant with over 30 years in planning drawings, building regulations, and residential development. He has prepared hundreds of successful applications across the UK, helping homeowners get projects approved quickly and with confidence.

Get Expert Advice →