Listed Buildings: Thinking about works on your listed property?

Article review and update information:
Last updated: September 26, 2025

Published: September 25, 2025

✅ Reviewed by Stuart Cronshaw   

Thinking about works on your listed property?

Before you start, check what’s allowed — and what requires Listed Building Consent.

Ask an Expert

Owning a listed building is a privilege — but it comes with strict planning rules. This guide explains what listed status means for homeowners, when consent is needed, how councils treat common works, and how to move your project forward without costly mistakes.

What Are Listed Buildings?

A listed building is one officially recognised for its architectural or historic importance. Once listed, the building (and often its curtilage — the land and structures around it) is protected by law. This means you’ll need special consent for alterations, extensions, or sometimes even routine maintenance.

Note: Listing doesn’t just cover the exterior. Internal features like fireplaces, staircases, doors, and even plaster mouldings can all be protected.

Grades of Listed Buildings Explained

In England and Wales, there are three main grades of listing:

  • Grade I – Buildings of exceptional interest (around 2.5% of listings)
  • Grade II* – Particularly important buildings (about 5.5%)
  • Grade II – Buildings of special interest (over 90%)

The grade affects how strictly works are scrutinised. For most homeowners, Grade II is the relevant category, but restrictions are still significant.

Tip: Always check the official listing description — it often specifies which parts of the property are protected.

You’ll need Listed Building Consent (LBC) for any work that could affect the character of the building, including:

  • Extensions and structural alterations
  • Installing new windows or double glazing
  • Adding solar panels or heat pumps
  • Internal changes (removing walls, fireplaces, staircases)
  • Exterior works like new doors, roof materials, or repointing

Even like-for-like repairs may need consent, depending on the council’s interpretation.

Important: Carrying out works without LBC is a criminal offence — fines are unlimited and enforcement can require you to reverse the work at your own cost.

Common Works & Council Quirks

Homeowners often run into issues with “everyday” upgrades:

  • Windows: Replacing timber with uPVC is almost always refused.
  • Solar panels: Some councils allow discreet roof-mounted panels; others refuse them outright.
  • Disabled access: Councils balance access requirements with historic preservation — designs must be sympathetic.
  • Energy efficiency (EPC): Listed buildings are usually exempt, but improvements still need consent.
Warning: Council “quirks” vary — what’s allowed in one area may be refused next door. Always check local guidance.

Not sure if your idea needs consent?

We’ll review your plans and confirm if Listed Building Consent or full planning permission is required.

Check My Project

Costs, Timelines & Local Factors

Applying for Listed Building Consent is free — but the cost lies in drawings, surveys, and delays. Applications typically take 8 weeks, though complex cases or objections can extend this.

  • Professional drawings: £1,000–£2,500
  • Heritage statements: £500–£1,000
  • Planning delays: can add months to your project
Tip: Combine your LBC and planning permission application (if needed) to save time and avoid conflicting approvals.

How to Apply for Listed Building Consent

  1. Check the listing details on Planning Portal or GOV.UK
  2. Prepare detailed drawings and a heritage statement
  3. Submit your application through the local council
  4. Consultation period (8 weeks typical)
  5. Receive decision notice — with conditions or restrictions

Plans Made Easy can manage this process, ensuring your submission meets both planning rules and heritage requirements.

FAQs

What are the different grades of listed buildings?

There are three grades: Grade I (exceptional interest), Grade II* (particularly important), and Grade II (special interest, most common). Each grade affects how strictly works are controlled.

When is listed building consent not required?

Minor like-for-like repairs may not need consent — but always confirm with your council. Even small changes, like replacing windows, usually require approval.

Can listed buildings have double glazing?

Standard double glazing is usually refused. However, secondary glazing or slimline heritage glazing may be accepted with consent.

How long does listed building consent take?

Most applications take around 8 weeks, but complex cases can take longer, especially if objections are raised.

Can listed buildings be demolished?

Demolition of a listed building is extremely rare and requires both Listed Building Consent and planning permission. Approval is almost always refused.

Ready to move your project forward?

Plans Made Easy can prepare compliant plans, manage submissions, and guide you from idea to approval.

Get in Touch

Next Steps & Useful Guides

Stuart Cronshaw – Plans Made Easy

Written & Reviewed by Stuart Cronshaw

Stuart is the founder of Plans Made Easy and an experienced architectural consultant with over 30 years in planning drawings, building regulations, and residential development. He has prepared hundreds of successful applications across the UK, helping homeowners get projects approved quickly and with confidence.

Get Expert Advice →

PME Global Author & Publisher Schema Active

Modern UK basement conversion with exposed brick walls, sofa, desk, and natural light — illustrating a comfortable, well-designed living space that meets planning and building regulations.
Extensions & Conversions
Stuart Cronshaw

Basement Conversions UK: Costs, Design, Rules & Building Regulations Explained

Transform your unused cellar into bright, livable space with a compliant basement conversion. This complete UK guide explains costs, waterproofing, planning rules, and building regulation essentials — including structure, drainage, fire escape, and ceiling height. Learn every step from idea to approval with trusted advice from Plans Made Easy.

Read More »
Planning Permission Herefordshire document with architectural plans, pencil, tape measure, and calculator on a desk — symbolising local planning applications and council approval process
Planning Permission Guides
Stuart Cronshaw

Planning Permission in Herefordshire: step-by-step guide, council policies, conservation & AONB checks, timescales, fees, and how to avoid refusals.

Planning Permission in Herefordshire explained: find out when you need approval, how Permitted Development works, and the local council “quirks” that affect extensions, lofts, and garden rooms. Covers conservation areas, AONB rules, sewers, fees, timescales, and common refusal reasons — with a step-by-step guide to smooth approvals.

Read More »
Modern UK home extension with patio, illustrating building regulations and planning rules for constructing over public sewers, including approvals and indemnity insurance requirements
Building Regulations
Stuart Cronshaw

Building Over Sewers – What You Must Know

Building over sewers in the UK requires a Build Over Agreement from your local water authority. Our guide explains when consent is needed, how the application works, typical costs, timelines, and local quirks. Avoid costly mistakes, protect your property value, and ensure Building Control approval before you start work.

Read More »
Contemporary wooden garden office or studio in a landscaped British garden, highlighting planning permission rules for garden buildings in the UK
Garden Buildings & Home Offices
Stuart Cronshaw

Do Garden Rooms Need Planning Permission? UK Rules & Council Quirks

Most garden rooms in the UK don’t need planning permission if they meet Permitted Development rules, such as size, height, and location limits. But conservation areas, sleeping accommodation, or oversized designs can trigger full approval. Learn the rules, council quirks, and Building Regulation requirements before you start

Read More »
SiteLock