Unsure if your project will pass Building Control?
Send us your plans and project details — we’ll check for compliance issues before the inspector arrives.
Quick Answer: Building Control Inspections are site visits by your council or an approved inspector to check that your extension, conversion, or building work complies with Building Regulations. They usually happen at key stages — foundations, damp-proofing, insulation, and completion. Passing smoothly depends on preparation, paperwork, and sometimes understanding local quirks.
What are Building Control Inspections?
Building Control Inspections are mandatory checks during construction. They ensure that your project follows Building Regulations for safety, energy efficiency, and structural stability. Depending on your local council or private inspector, you may have scheduled visits or need to request inspections at certain stages.
Note: Whether you apply via a Building Notice or Full Plans approval, inspections are required. The difference is whether your drawings are pre-checked or only reviewed on site.
When inspections are required
Inspections are staged throughout the build. Common trigger points include:
- Foundations — after excavation, before pouring concrete
- Damp Proof Course (DPC) — when laid, before covering
- Insulation — walls, floors, roofs before plastering or screeding
- Drainage — before backfilling trenches
- Structural elements — steel beams (RSJs), roof trusses
- Completion — once the work is finished
Important: Missing an inspection stage can delay sign-off. Always notify your inspector at least 24–48 hours before reaching a trigger point.
How to prepare for an inspection
Good preparation avoids costly delays. Before an inspection:
- Keep a compliance folder — insulation specs, structural calculations, concrete tickets, certificates
- Ensure the site is safe and accessible for the inspector
- Have your plans and approval documents available on site
- Communicate with your builder so key elements aren’t covered before inspection
Tip: If you’re not sure whether an inspection is required at a certain stage, call your Building Control officer directly. They’d rather advise early than fail a stage later.
Not sure if your idea fits Permitted Development?
We’ll check your project against PD rules and let you know if you need a full planning application.
Local council quirks
Different councils interpret Building Regulations slightly differently. Here are a few quirks we’ve noticed:
- Buckinghamshire Council — often strict on insulation thickness and airtightness tests.
- Guildford Council — may request additional structural details on loft conversions.
- Milton Keynes — known for insisting on on-site drainage soakaway tests before approval.
Always check your council’s specific guidance — but the national baseline remains the Planning Portal and GOV.UK.
Inspection costs and timescales
Costs are usually included in your Building Control application fee. Typical ranges:
- Small projects (garage conversions, internal walls): £300–£600
- Extensions: £600–£1,200
- Large new builds: £1,500+
Most inspections are arranged within 24–48 hours, but rural councils may take longer. Completion certificates are usually issued within 2–3 weeks after the final sign-off.
Conclusion
Building Control Inspections may feel like hurdles, but they exist to protect you and your investment. With the right plans, preparation, and awareness of council quirks, inspections can be straightforward. If in doubt, get professional drawings prepared and let experts manage the process for you.
Building Control Inspections – FAQs
Do I need to be present for a Building Control inspection?
It’s not essential, but it’s helpful. Your builder can host the inspector, but being there lets you hear feedback directly.
How many inspections will my project need?
Anywhere from 2 to 7 inspections, depending on the complexity of the build. Foundations, DPC, insulation, and completion are the most common checkpoints.
What happens if I fail an inspection?
The inspector will explain what must be corrected. Work usually pauses until the issue is resolved and rechecked.
Can I choose a private inspector instead of the council?
Yes — Approved Inspectors are an alternative to local authority Building Control. They can sometimes be faster, but fees vary.
Is the completion certificate important?
Absolutely — you’ll need it when selling, refinancing, or proving your home is compliant. Never skip it.
Ready to move your project forward?
Plans Made Easy can prepare compliant plans, manage submissions, and guide you from idea to approval.
Next steps & useful guides

Garage Conversions (UK): Permissions, Costs & Process
Thinking of converting your garage? Discover if you need planning permission, how Permitted Development works, and what Building Regulations demand. This complete UK guide covers realistic costs, council quirks, step-by-step process, and value impacts, so you can confidently plan your garage conversion and secure approvals without costly mistakes.

Certificates & Compliance Documents You Must Keep (UK Home Projects Guide)
Certificates & compliance documents prove your home project meets UK planning and building rules. From completion certificates to gas and electrical sign-offs, missing paperwork can cause delays, enforcement or issues with selling. This guide explains which documents you must keep, local council quirks, costs, and how to replace lost certificates.

Planning Permission Timelines (UK Guide): Key Stages, Limits & Council Rules
Planning permission in the UK typically takes around 8 weeks, but delays are common. This guide explains each stage of the timeline, council quirks, and what to do if your application runs late. Clear tips, FAQs, and local insights help you plan with confidence.

Kitchen Extensions: Costs, Planning Rules & Local Council Quirks (UK Guide)
Thinking about a kitchen extension? Our UK guide explains planning rules, council quirks, costs, timelines, and how much value you could add. Discover when Permitted Development applies, what approvals you’ll need, and how to make sure your extension is both compliant and worth the investment.

Loft Conversions (UK) — Costs, PD Rules, Process & Council Quirks
A clear UK homeowner’s guide to loft conversions — covering costs, timelines, types, planning permission vs Permitted Development, Building Regulations, and council quirks. Discover how much value a loft adds, what pitfalls to avoid, and the exact process step-by-step. Perfect if you’re considering a roof-light, dormer, hip-to-gable, or L-shaped conversion.

Building Control Inspections – What to Expect
Building Control inspections are essential checks during construction to make sure your project is safe, compliant and approved for resale. From foundations and drainage to insulation and final sign-off, inspectors ensure standards are met. Learn what councils look for, local quirks to prepare for, and how to avoid costly delays with expert guidance.

House Extensions – Complete UK Guide (Planning, Costs, Council Quirks)
Planning a house extension? Our complete UK guide explains when you can use Permitted Development, when you’ll need full planning permission, and the hidden council “quirks” that catch homeowners out. Includes costs, drawings, timelines, Building Control, and practical tips so you can expand your home smoothly and avoid delays.

Planning Permission Milton Keynes – Local Rules & Council Quirks Explained
Planning permission in Milton Keynes follows national rules but has extra council quirks. From parking standards to estate design codes, it’s vital to check if your project needs approval or falls under Permitted Development. This guide explains local requirements, costs, and FAQs so homeowners avoid mistakes and move projects forward confidently.

Planning Permission Loft Conversion (UK)
• Do you need planning permission for a loft conversion? Most houses can convert under Permitted Development if they stay within 40/50m³, avoid front dormers and keep ridge height. Learn the exceptions (conservation areas, Article 4, flats), costs, timelines and local council quirks for Bucks, Milton Keynes and Guildford, plus practical steps to secure approval.