Building Over Sewers – What You Must Know

Modern UK home extension with patio, illustrating building regulations and planning rules for constructing over public sewers, including approvals and indemnity insurance requirements
Article review and update information:
Last updated: October 3, 2025

Published: October 2, 2025

✅ Reviewed by Stuart Cronshaw   

Thinking about an extension or garden room near drains?

You may need special approval if your project builds over or close to a sewer pipe. Here’s what homeowners need to know.

Ask an Expert

Planning Rules • UK Sewers & Local Water Authority Quirks

Building Over Sewers – Rules, Approvals & Indemnity Insurance Explained

Summary: If you plan to extend or build near a public sewer, you’ll usually need approval from your local water authority (e.g., Thames Water, Severn Trent, Anglian Water). This is known as a Build Over Agreement. It protects both you and the authority, ensuring the sewer can still be accessed and isn’t damaged. Indemnity insurance may be needed if previous works were done without consent.

Quick Answer: Can You Build Over a Sewer?

Yes – but only with the right approval. In England and Wales, any building work within 3 metres of a public sewer or directly over it requires consent from your water authority. Without this, your local council may refuse sign-off, and problems can arise if you try to sell your property.

Tip: Private drains (that serve only your house) don’t normally need approval. Public shared sewers do.

When Consent is Required

You’ll usually need a Build Over Sewer Agreement if:

  • Your foundations are within 3 metres of a public sewer line.
  • You’re adding an extension, conservatory, garage conversion, or garden room over a sewer pipe.
  • Your design restricts access to manholes or inspection chambers.
Important: Building Control will not sign off works that cover a sewer without proof of consent.

Application Process & Agreements

Applications are made directly to your water provider. The process typically includes:

  1. Survey: Locate the sewer line using a water authority map or survey.
  2. Plans: Submit drawings showing how your build avoids or protects the pipe.
  3. Approval: Receive a Build Over Agreement (sometimes just a consent letter for minor works).
  4. Inspection: The authority may inspect works during or after construction.

Step-by-Step: Applying for a Build Over Sewer Agreement

Step What You Need to Do Typical Notes
1. Locate sewer line Check water authority maps or arrange a survey. Often within 3m of your foundations.
2. Prepare plans Submit scaled architectural drawings of your proposal. Must clearly show sewer route and foundation depth.
3. Apply to water authority Complete the Build Over Agreement form. Online for Thames Water; paper forms for others.
4. Pay fee Application fee typically £200–£500. Varies by sewer size and authority.
5. Await approval Authority reviews and issues consent letter. Usually 2–4 weeks for standard cases.
6. Inspections Works may be inspected during or after construction. Ensures pipe integrity and access remain.
Warning: If you start work without a Build Over Agreement, Building Control may refuse to issue a completion certificate. This can delay your project, increase costs, and cause serious issues when selling or remortgaging your home.

Not sure if your extension crosses a sewer line?

Send us your plans and we’ll confirm if you need a Build Over Agreement before you apply for planning.

Check My Project

Indemnity Insurance Explained

If a previous owner built over a sewer without consent, indemnity insurance may be required when selling or remortgaging. This protects buyers and lenders if the water authority ever raises an issue.

Local Council & Water Authority Quirks

Each water authority has its own guidance. For example:

  • Thames Water: Online application portal; fees vary by pipe size.
  • Severn Trent: Often stricter on inspection chambers; may require relocation.
  • Anglian Water: Clear technical drawings needed upfront.
Note: Some councils won’t validate your planning application until sewer matters are settled. Always check early.

Typical Costs & Timelines

Costs vary by authority, but as a guide:

Work Type Typical Fee Approval Time
Minor build near sewer £200–£300 1–2 weeks
Building directly over sewer £350–£500+ 2–4 weeks
Quick Costs Snapshot: Most Build Over Agreements cost between £200–£500 and take around 2–4 weeks for approval. Fees rise if pipes are larger or chambers must be moved.

FAQs – Building Over Sewers

What is a Build Over Sewer Agreement?

A formal consent from your water authority allowing construction over or near a public sewer, ensuring pipes remain safe and accessible.

Can I build over a sewer without permission?

No. It risks refusal of Building Control sign-off and problems during property sales.

What happens if I build without approval?

You may face enforcement, extra costs for remedial works, or difficulty remortgaging/selling your home.

How close can I build to a sewer line?

Generally, you need approval within 3 metres of a public sewer. Rules vary by authority.

Do I need indemnity insurance?

Only if the sewer was built over without consent. Insurers provide cover to satisfy lenders and buyers.

Ready to move your project forward?

Plans Made Easy can prepare compliant plans, manage Build Over applications, and guide you through approval.

Get in Touch

Next steps & useful guides

For more detailed rules, see Planning Portal and GOV.UK guidance.

Stuart Cronshaw – Plans Made Easy

Written & Reviewed by Stuart Cronshaw

Stuart is the founder of Plans Made Easy and an experienced architectural consultant with over 30 years in planning drawings, building regulations, and residential development. He has prepared hundreds of successful applications across the UK, helping homeowners get projects approved quickly and with confidence.

Get Expert Advice →

PME Global Author & Publisher Schema Active

Modern UK basement conversion with exposed brick walls, sofa, desk, and natural light — illustrating a comfortable, well-designed living space that meets planning and building regulations.
Extensions & Conversions
Stuart Cronshaw

Basement Conversions UK: Costs, Design, Rules & Building Regulations Explained

Transform your unused cellar into bright, livable space with a compliant basement conversion. This complete UK guide explains costs, waterproofing, planning rules, and building regulation essentials — including structure, drainage, fire escape, and ceiling height. Learn every step from idea to approval with trusted advice from Plans Made Easy.

Read More »
Planning Permission Herefordshire document with architectural plans, pencil, tape measure, and calculator on a desk — symbolising local planning applications and council approval process
Planning Permission Guides
Stuart Cronshaw

Planning Permission in Herefordshire: step-by-step guide, council policies, conservation & AONB checks, timescales, fees, and how to avoid refusals.

Planning Permission in Herefordshire explained: find out when you need approval, how Permitted Development works, and the local council “quirks” that affect extensions, lofts, and garden rooms. Covers conservation areas, AONB rules, sewers, fees, timescales, and common refusal reasons — with a step-by-step guide to smooth approvals.

Read More »
Modern UK home extension with patio, illustrating building regulations and planning rules for constructing over public sewers, including approvals and indemnity insurance requirements
Building Regulations
Stuart Cronshaw

Building Over Sewers – What You Must Know

Building over sewers in the UK requires a Build Over Agreement from your local water authority. Our guide explains when consent is needed, how the application works, typical costs, timelines, and local quirks. Avoid costly mistakes, protect your property value, and ensure Building Control approval before you start work.

Read More »
Contemporary wooden garden office or studio in a landscaped British garden, highlighting planning permission rules for garden buildings in the UK
Garden Buildings & Home Offices
Stuart Cronshaw

Do Garden Rooms Need Planning Permission? UK Rules & Council Quirks

Most garden rooms in the UK don’t need planning permission if they meet Permitted Development rules, such as size, height, and location limits. But conservation areas, sleeping accommodation, or oversized designs can trigger full approval. Learn the rules, council quirks, and Building Regulation requirements before you start

Read More »